• Careers
  • Contact Us
  • Emerson.com
  • English / United States [ Change ]
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
    • Chapters
    • descriptions off, selected
    • captions off, selected

      Improving Control System Reliability by Proper Grounding System and Sound Engineering

      33:05

      QSWP of Saudi Aramco is the biggest Sea Water Injection Plant is the world. For process control and monitoring Delta V DCS System is used. One area of QSWP “Old Treatment Modules” had very high nuisance Equipment Trips. To resolve this problem a new Grounding system was constructed for each Treatment Module and 29 High Power Solenoids at each Module were replaced by Low Powered Solenoids. Solenoids were connected directly to Delta V - DO Cards. This resulted in reduced equipment trips. Saving of $ 635,000 per year was achieved by way of production loss avoidance and Man-hour saving.

      View Less
      Please enable JavaScript to use this website.

      Share this video

      Embed